Contractual correspondence for architects and project managers / David Chappell.

By: Chappell, David (David M.).
Material type: materialTypeLabelBookPublisher: Oxford [England] ; Malden, MA : Blackwell Pub., c2006Edition: 4th ed.Description: xi,281p. ; 25 cm.ISBN: 140513514X (hardback : alk. paper); 9781405135146.Subject(s): Architectural contracts -- Great Britain -- Forms | Architects -- Legal status, laws, etc. -- Great Britain -- Forms | Law | Architecture | Building construction & materialsDDC classification: 692.8 CHA Summary: Providing over 150 model letters, with a user-friendly description on use with all the main JCT building forms, these standard letters save time and provide a reliable tool for dealing with problems.

Enhanced descriptions from Syndetics:

This book provides over 160 model letters, with commentary for use with all the main JCT 2005 building contracts. It concentrates on problems which can arise during a project, and draws on the author's extensive experience as a contracts consultant. It is a companion to the author's Standard Letters in Architectural Practice which covers more routine matters.

The revised Fourth Edition takes account of:

the 2005 editions of the JCT Standard Building Contract, the Intermediate Building Contract and the Minor Works Building Contract, both with their contractor's design versions, ICD and MWD the 2004 updates of the Standard Form of Agreement for the Appointment of an Architect changes to case law since the last edition was published in 1996

It will be an invaluable guide for architects, building surveyors and project managers.

Includes index.

Providing over 150 model letters, with a user-friendly description on use with all the main JCT building forms, these standard letters save time and provide a reliable tool for dealing with problems.

Table of contents provided by Syndetics

  • Preface to the Fourth Edition (p. ix)
  • A Appraisal (p. 1)
  • A1 Client's bona fides: in doubt (p. 1)
  • A2 If your client is a private individual (a consumer) (p. 3)
  • A3 Fee recovery (p. 3)
  • A4 If two separate individuals or companies wish to commission you jointly (p. 10)
  • A5 Appointment, if architect asked to tender on fees (p. 13)
  • A6 Brief: difficulty in obtaining decisions (p. 13)
  • A7 Consultants: client requiring them to be appointed through the architect (p. 16)
  • A8 Other architects, if previously commissioned (p. 20)
  • A9 Site boundaries: unclear (p. 26)
  • A10 Existing property, if urgent repair work required (p. 26)
  • A11 Client: if wanting to proceed with inadequate planning permission (p. 30)
  • B Strategic Briefing (p. 32)
  • B1 Brief: unacceptable requirements (p. 32)
  • C Outline Proposals (p. 34)
  • C1 Objections: by client (p. 34)
  • C2 Objections: by planning authority, civic society etc. (p. 34)
  • D Detailed Proposals (p. 40)
  • D1 Client, if no reply (p. 40)
  • D2 Client, if another architect appointed to continue work (p. 40)
  • D3 Client, if preference expressed for a particular sub-contractor (p. 42)
  • D4 Client: objection to the use of sub-contractor or supplier in a design capacity (p. 49)
  • E Final Proposals (p. 51)
  • E1 Client: wishing to modify brief (p. 51)
  • F Production Information (p. 54)
  • F1 Client: declines to use a standard contract (p. 54)
  • F2 Client: wishes to use a partnering agreement without a legally binding contract (p. 54)
  • F3 Client: wishes to include unsuitable contractor on tender list (p. 54)
  • F4 Client: asks you to recommend a contractor (p. 59)
  • F5 Client: reluctance to appoint a full-time clerk of works (p. 59)
  • F6 Consultants, if late in supplying drawings and specification (p. 59)
  • F7 Sub-contractor or supplier, if tender not on standard form or conditions attached (p. 63)
  • F8 Sub-contractor or supplier, if price too high (p. 63)
  • F9 Letters of intent to sub-contractors or suppliers (p. 67)
  • G Bills of Quantities (p. 69)
  • G1 Drawings, if not ready (p. 69)
  • G2 Bills of quantities, if behind programme (p. 70)
  • H Tender Action (p. 73)
  • H1 Client, if he wishes to accept the lowest, but unsatisfactory, tender (p. 73)
  • J Mobilisation (p. 76)
  • J1 Clerk of works: letter of instruction (p. 76)
  • J2 Letter of intent: contractor (p. 76)
  • J3 Consents: not received from planning authority, building control, statutory undertakings (p. 81)
  • K Construction to Practical Completion (p. 88)
  • K1 Commencement before formal contract (p. 88)
  • K2 Contract documents: initials missing (p. 90)
  • K3 Contract documents: drawings amended (p. 93)
  • K4 Drawings, schedules: not ready (p. 93)
  • K5 Failure to give possession on the due date (p. 98)
  • K6 Meetings: standing of minutes as a record (p. 100)
  • K7 Master programme: alleged approval by architect (p. 102)
  • K8 Master programme - if contractor changes it (p. 105)
  • K9 Printed conditions and bills of quantities (or specification) not in agreement (p. 110)
  • K10 Work not in accordance with comments on the submitted documents (p. 110)
  • K11 Discrepancy between bills of quantities, schedules of work, specification, architect's instruction, CDP documents or statutory requirements and contract documents, not found by the contractor (p. 112)
  • K12 Certification, if claim not yet ascertained (p. 115)
  • K13 Certification: certificate not received by the employer (p. 119)
  • K14 Certification: contractor threatening to suspend, because the architect has undercertified (p. 120)
  • K15 Certification: if there is a serious defect less than five days before the final date for payment (p. 123)
  • K16 Instruction: contractor's refusal to carry out forthwith (p. 123)
  • K17 Instructions: by building control officer (p. 132)
  • K18 Setting out: architect requested to check (p. 133)
  • K19 Defective work: dealing with the problem (p. 140)
  • K20 Defective work: late instructions to remove (p. 146)
  • K21 Materials, goods and workmanship: not procurable (p. 151)
  • K22 Inspection: architect's duties (p. 158)
  • K23 Inspection of work covered up (p. 160)
  • K24 Person-in-charge: non-notification (p. 163)
  • K25 Variations: change in scope and character of the work (p. 166)
  • K26 Postponement: claimed implied in instructions (p. 167)
  • K27 If suspension letter received from contractor (p. 167)
  • K28 Liquidated damages: objections by contractor (p. 173)
  • K29 Termination: by employer (p. 175)
  • K30 Termination: by contractor (p. 183)
  • K31 Works by employer or persons employed or engaged by employer: contractor claiming that timing not convenient (p. 193)
  • K32 Reference to your 'nominated' sub-contractor (p. 197)
  • K33 Sub-contractor: drawings for approval (p. 197)
  • K34 Arbitration: threatened over a small matter (p. 201)
  • K35 Adjudication: threatened over a small matter (p. 201)
  • K36 Adjudication: if architect asked to respond on behalf of the employer (p. 205)
  • K37 Employer: instructions given direct to the contractor (p. 205)
  • K38 Employer: additional items forgotten by architect (p. 210)
  • K39 Clerk of works: faulty written directions acted upon by the contractor (p. 214)
  • K40 Clerk of works: verification of daywork sheets (p. 214)
  • K41 Consultants: instructions direct to the contractor (p. 217)
  • K42 Consultants: problems with builder's work (p. 219)
  • K43 Extension of time (p. 222)
  • K43.1 Awarding an extension if bills of quantities show phased completion and only one completion date in contract (p. 222)
  • K43.2 Failure to fix a completion date within the appropriate time (p. 223)
  • K43.3 Best endeavours: contractor's claim for extra payment (p. 225)
  • K43.4 Claims for extension of time: procedure before the contract completion date (p. 228)
  • K43.5 After practical completion (p. 229)
  • K43.6 If the project manager has agreed an extension of time with the contractor (p. 229)
  • K44 Claims for loss and/or expense: procedure (p. 235)
  • K45 Claims for loss and/or expense made months after practical completion (p. 240)
  • K46 Practical completion: alleged by contractor (p. 240)
  • K47 Practical completion: instructed by the client (p. 242)
  • L After Practical Completion (p. 246)
  • L1 Rectification period: urgent defects (p. 246)
  • L2 Rectification period: issue of list (p. 246)
  • L3 Rectification period: contractor slow in remedying defects (p. 251)
  • L4 Rectification period: contractor claims some items are not defects (p. 251)
  • L5 Rectification period: employer's refusal to allow making good (p. 253)
  • L6 Final certificate: contractor demands issue (p. 253)
  • L7 Employer: overspending notification (p. 258)
  • L8 As-built records, if contractor or sub-contractor will not supply (p. 260)
  • L9 Defects after final certificate: latent defects (p. 262)
  • M Feedback (p. 266)
  • M1 Complaints from client (p. 266)
  • Appendix 1 (p. 268)
  • How to write letters (p. 268)
  • Appendix 2 (p. 274)
  • How to make a good decision (p. 274)
  • Index (p. 279)